logo Rizzani de Eccher
Non è possibile visualizzare il filmato. Potrebbe essere necessario installare il plugin flash, puoi scaricarlo qui
MOSCOW REFINERY, RUSSIA
11/13/2020

 

On November 13th, two contracts were signed between Rizzani de Eccher and Saipem for the construction of two projects within the Moscow Refinery industrial complex owned by the Russian oil giant Gazprom Neft.
The first project, worth 16 million euros, is the construction and the subsequent installation of the metal structures supporting the above-ground piping system serving the entire refinery complex. The total area is about 22,500 m2.
The second project, worth 9 million euros, is the design and construction of two buildings.
The ERTS Building, serving the entire SRU-2 area, will be used for the installation of transformers, ventilation machines and other necessary mechanical systems. The building will have three floors above ground and a height of about 20 m for a total development of 3,200 m2.
The Solidification Building will be a highly technological building that will house the two silos for the solidification of liquid sulfur that will be produced as waste material in the oil refining. The building will have a height of approximately 32.5 m with 2 levels above ground for a total area of approximately 1,850 m2.
This new construction confirms and strengthens Rizzani de Eccher's long-lasting collaboration with Saipem and the Gazprom Group in the construction of industrial infrastructures in the Russian market

back

Search Group De Eccher's news archive sorted by year:

link homeVersione Russa
link a Deal